Diversification of production – CET Nord 2

Bepco supplemented the product sources with 3 engines producing electric and thermic energy in high level congeneration. The investition was realized on a 600mp land area in a brand new building.
Supplementation was necessary due to the closure of CET Braşov ( which must ensure the peaks in the cold season) and was based on data provided by the thermal energy required Local Government.

The new engines CET North 2 had internal combustion and use gas as a fuel.

Tip instalatie de ardere Putere termica nominala (MWt) Putere electrica nominala (MWe) Consum gaz metan
Instalatie de cogenerare termica si electrica  tip JMS 624-GS-N.LC nr.1 3,728 4,397 995
Instalatie de cogenerare termica si electrica  tip JMS 624-GS-N.LC nr.2 3,728 4,397 995
Instalatie de cogenerare termica si electrica  tip JMS 624-GS-N.LC nr.2 3,728 4,397 995
TOTAL 11,184 13,191 2985

In a future development stage we have in mind construction and installation, in the same building, 4 congeneration installation together with annex equipment.