Reconnecting the  first apartment building of Braşov

Bepco identified, initiated and financed the reconnecting  project with individual contorisation of an apartment building in Brasov, located on str. No. 45 Mircea cel Batran. Since early November, residents  from 35 apartments in this block, mostly owners of  urban heating boilers, tested the benefits and their reactions were positive. For reconnecting  a partnership between Bepco […]

Citeste tot articolul

Diversification of production – CET Nord 2

Bepco supplemented the product sources with 3 engines producing electric and thermic energy in high level congeneration. The investition was realized on a 600mp land area in a brand new building. Supplementation was necessary due to the closure of CET Braşov ( which must ensure the peaks in the cold season) and was based on […]

Citeste tot articolul

Pilot project modernizare of the termoficare system of Brasov city

Bepco release and finance a pilot project that care suntmontate module termice for 3 blocks from Brasov. One of them benefits of a de distribuţiepeorizontală cu contorizareindividuală. The total cost for the project was 250.000 euro. What’s an thermic module? The thermic module it’s similar with the puncttermic, but have smaller dimensions and it can […]

Citeste tot articolul

Bepco production start

At the beginning of the year, Bepco took over the Eco-Heat Project for eficientizare a surselor de producţiepentruîncălzireacentralizată din Braşov.In November 2010, Bepco started to deliver agentului termic către consumatorii branşaţi la sistemulcentralizat. The implemented modern solution consisted in: amplasarea de centrale de cogenerare – motoare cu combustie internă (GE Jenbacher), care functionează pe bază […]

Citeste tot articolul